{"id":8656,"date":"2026-11-10T14:17:16","date_gmt":"2026-11-10T13:17:16","guid":{"rendered":"https:\/\/leanandsmartpro.com\/01-budzetiranje-planiranje\/"},"modified":"2026-11-17T09:01:58","modified_gmt":"2026-11-17T08:01:58","slug":"01-budzetiranje-izrada-plana","status":"publish","type":"page","link":"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/","title":{"rendered":"01 Budgeting \u2013 Building the budget"},"content":{"rendered":"<div class=\"wp-block-group\" style=\"padding-top:48px;padding-right:24px;padding-bottom:64px;padding-left:24px;font-size:18px;line-height:1.6\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-container-core-group-is-layout-1d28726b wp-block-group-is-layout-constrained\">\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>01 \u2013 BUDGETING: PREPARING THE PLAN<\/strong><\/p>\n\n\n\n<h1 class=\"wp-block-heading\" style=\"margin-top:22px;margin-bottom:12px\">How to prepare the annual operating budget of a large manufacturing company<\/h1>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><em>A practical guide to planning sales, production capacity, staffing, materials, operating costs and business resources.<\/em><\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\">The annual operating budget connects expected sales with production capabilities, resource requirements and costs. Sales, production, procurement, logistics, maintenance, quality, HR and finance develop it together. Business objectives and realistic assumptions provide the starting point; the result is an aligned plan showing what the company can achieve and under which conditions.<\/p>\n\n\n\n\n\n\n\n<p class=\"wp-block-paragraph\"><strong>In this article<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n\n<li><a href=\"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#priprema-budzeta\">Preparation: objectives, data and responsibilities<\/a><\/li>\n\n\n<li><a href=\"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#plan-prodaje\">Sales plan: volumes, prices and mix<\/a><\/li>\n\n\n<li><a href=\"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#proizvodnja-kapaciteti\">Production: aligning plans and capacity<\/a><\/li>\n\n\n<li><a href=\"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#materijali-zaposlenici\">Materials, staffing and labour costs<\/a><\/li>\n\n\n<li><a href=\"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#operativni-troskovi\">Other operating costs and responsibilities<\/a><\/li>\n\n\n<li><a href=\"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#kalkulacija-proizvoda\">Standard costs and product profitability<\/a><\/li>\n\n\n<li><a href=\"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#provjera-odobrenje\">Monthly planning, validation and budget approval<\/a><\/li>\n\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">From the sales plan to the operating budget<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The operating budgeting process can be presented as a series of interconnected stages.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Stage<\/th><th>Key question<\/th><\/tr><\/thead><tbody><tr><td><strong>1. Sales plan<\/strong><\/td><td>What do we expect to sell, to whom, when and at what price?<\/td><\/tr><tr><td><strong>2. Production plan<\/strong><\/td><td>How much must we produce, and through which production processes?<\/td><\/tr><tr><td><strong>3. Capacity plan<\/strong><\/td><td>Do we have enough available machines, hours and employees?<\/td><\/tr><tr><td><strong>4. Resource plan<\/strong><\/td><td>How much material, labour, energy and other resources will we need?<\/td><\/tr><tr><td><strong>5. Cost plan<\/strong><\/td><td>How much will the planned activities cost?<\/td><\/tr><tr><td><strong>6. Consolidation<\/strong><\/td><td>Are all plans aligned and financially viable?<\/td><\/tr><tr><td><strong>7. Approval<\/strong><\/td><td>Which plan becomes the official basis for managing the company?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">These stages are not completely separate. If planning reveals that the sales plan requires capacity the company does not have, production, costs or sales assumptions must be reconsidered. This chapter presents the complete process of preparing a manufacturing company's annual operating budget, from establishing business assumptions to final consolidation and approval of the plan.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n\n\n<h2 class=\"wp-block-heading\" id=\"priprema-budzeta\" style=\"margin-top:32px;margin-bottom:12px\">Preparation: objectives, data and responsibilities<\/h2>\n\n\n\n<div class=\"wp-block-media-text has-media-on-the-right is-stacked-on-mobile is-vertically-aligned-top\" style=\"grid-template-columns:auto 42%\"><div class=\"wp-block-media-text__content\">\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Preparation of the budgeting process often determines the quality of the final result. Companies that begin planning without clearly defined objectives, methods and responsibilities risk receiving departmental plans that do not align. In practice, sales may forecast significant growth while production plans capacity around the previous year's workload. Procurement may use different assumptions about material quantities, while HR plans headcount independently of expected production needs. Each plan may be justified in isolation, but together they do not form a coherent business budget.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The initial budgeting stage is generally led by company management, with support from finance and controlling. Management defines the key business objectives for the next period. These may include revenue growth, higher profitability, improved productivity, increased market share, new product development, lower debt or greater production capacity. These objectives provide the framework within which departments prepare their operating plans. However, business ambitions must be distinguished from realistically achievable targets. An expected percentage increase in revenue must be connected to specific market demand, production capabilities and the resources required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">If the company plans revenue growth, it must understand whether that growth will come from higher sales volumes, changes in selling prices, new products or a different product mix. Each possibility has different implications for production, staffing, material costs and profitability. It is equally important to distinguish the targets the company wants to achieve from the assumptions it considers most likely. Management may set a more ambitious growth target than current orders support, but it must then be clear which additional activities will be used to try to close the gap.<\/p>\n\n\n\n\n<\/div><figure class=\"wp-block-media-text__media\"><a href=\"https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/Slika-ChatGPT-11.-stu-2026.-09_28_12.png\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1122\" height=\"1402\" src=\"https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/Slika-ChatGPT-11.-stu-2026.-09_28_12.png\" alt=\"Tijek izrade godi\u0161njeg bud\u017eeta: poslovni ciljevi, prodaja, proizvodnja, resursi, odjelni bud\u017eeti, konsolidacija, odobrenje i pra\u0107enje.\" class=\"wp-image-8680 size-full\" srcset=\"https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/Slika-ChatGPT-11.-stu-2026.-09_28_12.png 1122w, https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/Slika-ChatGPT-11.-stu-2026.-09_28_12-240x300.png 240w, https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/Slika-ChatGPT-11.-stu-2026.-09_28_12-819x1024.png 819w, https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/Slika-ChatGPT-11.-stu-2026.-09_28_12-768x960.png 768w, https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/Slika-ChatGPT-11.-stu-2026.-09_28_12-10x12.png 10w\" sizes=\"(max-width: 1122px) 100vw, 1122px\" \/><\/a><\/figure><\/div>\n\n\n\n\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Before preparing a new budget, the previous period's business performance must be analysed in detail. Financial statements provide the starting point, but sound operating planning also requires analysis of production indicators. Actual output, productivity, capacity utilisation, material consumption, labour costs, downtime, scrap, customer complaints and delivery reliability are particularly important. The analysis must also cover differences between the previous budget and actual results. If material costs were significantly above plan, it is necessary to establish whether this resulted from higher production volumes, changes in purchase prices or product mix, or higher consumption per unit. This approach helps eliminate incorrect assumptions carried over from earlier planning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Exceptional and one-off costs must also be identified. For example, a major unplanned overhaul or a one-off customer claim should not automatically be carried into the next budget unless it represents an expected recurring activity. Similarly, savings achieved in the previous year must be analysed to establish whether they reflect lasting process improvements or temporary circumstances.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Budgeting methods and organisation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Large manufacturing companies often combine several budgeting methods. In a <em>top-down<\/em> approach, management sets the overall financial targets, whereas in a <em>bottom-up<\/em> approach, individual departments build their plans around their operating activities and needs. In practice, combining the two approaches is most useful. Management sets strategic objectives and financial constraints, while departments prepare the detailed plans needed to achieve them. Budgeting based on cost drivers (<em>driver-based budgeting<\/em>).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">This approach starts with the activities that cause costs rather than primarily with the previous year's financial figures. For example, material costs are planned from production volumes and standard consumption, labour costs from the working hours required, and energy costs from the expected equipment load. For certain categories, such as administrative costs and external services, the company can also use <em>zero-based budgeting<\/em>, which reassesses the justification for individual costs from scratch.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Finance and controlling generally coordinate the process, prepare templates and methods, monitor deadlines and check the consistency of submitted data. Operating departments are responsible for the quality of their own plans and the credibility of the assumptions behind them. Budget version control must also be defined. Planning often produces several working versions, and changes to the sales plan may require production and cost plans to be recalculated. It must therefore be clear which data version is current, who can change it and when each planning stage is considered complete.<\/p>\n\n\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"plan-prodaje\" style=\"margin-top:32px;margin-bottom:12px\">Sales plan: volumes, prices and mix<\/h2>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The sales plan provides the starting point for almost all subsequent operating budgeting activities. Expected sales determine required production volumes, material purchases, capacity loading, staffing needs, logistics requirements and other operating resources. At the same time, the sales plan defines expected revenue and forms the basis for profitability planning. However, this is precisely where companies often make the mistake of expecting the sales plan to be an exact forecast of future orders. In reality, that level of accuracy is very difficult, and often impossible, to achieve.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">In project-based manufacturing, future revenue depends on the timing of new contracts, progress on existing projects, investors' decisions and possible schedule changes. Even after a project is contracted, its delivery may be delayed or spread differently from the initial expectation. In serial production, companies often depend on a relatively small number of major customers. Although framework agreements and long-term forecasts exist, customers adapt their requirements to market conditions, demand changes and their own production plans. Actual orders during the year can therefore differ significantly from the initial forecasts.<\/p>\n\n\n\n\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>Once approved, the sales plan becomes the reference baseline for the annual budget.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">This does not mean that business must follow the original assumptions throughout the year, but that changes must be clearly identifiable, analysable and explainable. The original budget remains the reference point, while current expectations are updated through forecasts or reforecasts as needed. In this way, the sales plan becomes more than the sales department's expectation: it forms the foundation of an integrated operating and financial management system.<\/p>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile is-vertically-aligned-top\" style=\"grid-template-columns:42% auto\"><figure class=\"wp-block-media-text__media\"><a href=\"https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/8c85ca8a-9d33-4270-a017-e6698e23b18f.png\"><img decoding=\"async\" width=\"1122\" height=\"1402\" src=\"https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/8c85ca8a-9d33-4270-a017-e6698e23b18f.png\" alt=\"Osam koraka pripreme prodajnog plana, od kontakta s kupcima do uskla\u0111enja s proizvodnjom i controllingom.\" class=\"wp-image-8681 size-full\" srcset=\"https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/8c85ca8a-9d33-4270-a017-e6698e23b18f.png 1122w, https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/8c85ca8a-9d33-4270-a017-e6698e23b18f-240x300.png 240w, https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/8c85ca8a-9d33-4270-a017-e6698e23b18f-819x1024.png 819w, https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/8c85ca8a-9d33-4270-a017-e6698e23b18f-768x960.png 768w, https:\/\/leanandsmartpro.com\/wp-content\/uploads\/2026\/11\/8c85ca8a-9d33-4270-a017-e6698e23b18f-10x12.png 10w\" sizes=\"(max-width: 1122px) 100vw, 1122px\" \/><\/a><\/figure><div class=\"wp-block-media-text__content\">\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Customers, sales volumes and prices<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Preparing the sales plan begins with an analysis of existing customers and expected business activity in the next period. Confirmed orders, long-term contracts, customers' indicative requirements, planned new projects and historical delivery data are particularly important. In industries where production is based on long-term projects, individual product life cycles must be analysed. New projects may enter production during the year while existing products are gradually phased out. Sales volumes must therefore be planned by month, taking into account expected production launches, ramp-up schedules and possible order changes. In serial production, reviewing the reliability of a customer's previous forecasts is particularly useful.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">If a customer regularly submits annual plans that change significantly during the year, that experience should inform the new budget. In project-based manufacturing, particular attention must be paid to the likelihood of winning new projects and whether planned delivery dates are realistic. Contracted business must be distinguished from potential projects that are not yet confirmed. The sales plan should be neither excessively optimistic nor unnecessarily conservative. Its quality comes from objectively assessing the available information and transparently presenting the key uncertainties.<\/p>\n\n\n<\/div><\/div>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Total planned revenue is the sum of the expected revenue from individual products or product groups. The basic calculation is straightforward:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>Planned revenue = Planned sales quantity \u00d7 Planned net selling price<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">In practice, however, rebates, agreed discounts, price changes, exchange rates and other contractual terms must be considered. For international companies, sales across different markets and contracts in different currencies add complexity. All departments must therefore use common exchange-rate assumptions and an agreed revenue planning method. Shipments must also be distinguished from accounting revenue recognition, as these do not always occur at the same time. Particular attention is needed where prices change during the year. If a selling price increase applies from an agreed date, the revenue plan must reflect its expected timing rather than applying the new price to the entire year.<\/p>\n\n\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Understanding the product mix is one of the more important aspects of sales planning. Two products may generate similar revenue but require completely different production resources. A more complex product may command a higher selling price while also requiring more working hours, more expensive materials or additional processing operations. Higher revenue therefore does not automatically mean a proportional increase in profit. More importantly, even unchanged revenue can be accompanied by significant changes in the cost structure.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Products A and B: same revenue, different resources<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Consider a simplified example of a company making two products. Product A has a high proportion of material costs, while product B requires substantially more manual work. Assume both products have the same net selling price of EUR 100.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Indicator<\/th><th>Product A<\/th><th>Product B<\/th><\/tr><\/thead><tbody><tr><td>Selling price<\/td><td>100 \u20ac<\/td><td>100 \u20ac<\/td><\/tr><tr><td>Direct material per unit<\/td><td>60 \u20ac<\/td><td>20 \u20ac<\/td><\/tr><tr><td>Standard working time<\/td><td>1 hour<\/td><td>3 hours<\/td><\/tr><tr><td>Initial sales plan<\/td><td>1.000 units<\/td><td>1.000 units<\/td><\/tr><tr><td>Updated sales plan<\/td><td>800 units<\/td><td>1.200 units<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">In its initial plan, the company expected revenue of EUR 200.000, material consumption worth EUR 80.000 and a total of 4.000 standard working hours. Expected demand changes during the year: product A sales fall while demand for product B rises. Total expected revenue remains unchanged at EUR 200.000. Nevertheless, planned material consumption at the same standards falls to EUR 72.000, while the standard working hours required increase to 4.400.<\/p>\n\n\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Indicator<\/th><th>Original budget<\/th><th>Updated plan<\/th><th>Change<\/th><\/tr><\/thead><tbody><tr><td>Total sales<\/td><td>2.000 units<\/td><td>2.000 units<\/td><td>0<\/td><\/tr><tr><td>Revenue<\/td><td>200.000 \u20ac<\/td><td>200.000 \u20ac<\/td><td>0 \u20ac<\/td><\/tr><tr><td>Standard material cost<\/td><td>80.000 \u20ac<\/td><td>72.000 \u20ac<\/td><td>\u22128.000 \u20ac<\/td><\/tr><tr><td>Standard working hours required<\/td><td>4.000 h<\/td><td>4.400 h<\/td><td>+400 h<\/td><\/tr><tr><td>Change in working hours required<\/td><td>\u2014<\/td><td>\u2014<\/td><td>+10%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">In this example, standard material consumption is EUR 8.000 lower and an additional 400 working hours are required, even though expected revenue is unchanged. This does not automatically mean that total material expenses for the period are EUR 8.000 lower or that payroll costs have risen proportionally. The actual financial effect also depends on inventory, available employees, work organisation and the fixed and variable cost structure. Nevertheless, the example clearly demonstrates why product mix matters. Here, lower material consumption is not the result of improved material efficiency, just as the additional working hours are not the result of poorer productivity. Both changes arise from a different sales mix.<\/p>\n\n\n\n\n\n\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"proizvodnja-kapaciteti\" style=\"margin-top:32px;margin-bottom:12px\">Production: aligning plans and capacity<\/h2>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Once the initial sales plan has been prepared, the company must check whether its production system can deliver the planned quantities within the expected timescales. This process is often organised through <em>Sales &amp; Operations Planning<\/em> (S&amp;OP), or integrated sales and operations planning. Its purpose is to align expected demand with the company's available production capacity, materials, employees and financial resources. In large manufacturing organisations, this stage often reveals significant gaps between business ambitions and actual operating capabilities. A sales plan is not automatically a feasible production plan.<\/p>\n\n\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">S&amp;OP: feasibility and financial implications<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Production and planning analyse the expected load on production lines, machines and processing operations. Particular attention is paid to potential bottlenecks. At the same time, procurement checks the availability of critical materials, lead times and supplier capacity. If existing resources cannot deliver the sales plan, ways of increasing capacity must be considered. These may include different shift patterns, overtime, productivity improvements, subcontracting or investment in additional equipment. Each option has a different operating and financial impact.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Controlling should be involved at this stage to assess the financial implications of different operating scenarios. For example, an additional shift may increase available capacity but require more employees, additional energy costs and a greater maintenance workload. Subcontracting may allow additional orders to be fulfilled quickly, but may involve higher unit costs and different quality or delivery risks. Investing in new equipment may be a better long-term solution, but requires implementation time and substantial funding. Decisions should therefore consider overall economic viability as well as the technical possibility of increasing capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The S&amp;OP process should produce an agreed plan for sales, production and the resources required. This provides the basis for further development of the annual budget. The approved plan must be accepted not only by sales and production but also by the functions responsible for procurement, logistics, staffing and finance. This reduces the risk of departments later preparing budgets from different production quantities or inconsistent assumptions. S&amp;OP is also not a once-a-year process. The initial plan is used to prepare the budget, but it is updated regularly throughout the year as demand and operating capabilities change.<\/p>\n\n\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The production plan must provide the product quantities required by the sales plan and planned inventory policy. Planned sales are not necessarily equal to planned production. A company may begin the year with finished goods inventory or plan to increase stocks in anticipation of higher demand. Planned production is therefore calculated as follows:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>Planned production = Planned sales + Target closing inventory \u2212 Opening inventory<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The resulting figure is the required quantity of conforming finished products, not necessarily the total number of units that must enter the production process. In project-based production, the plan must also be linked to individual projects, their deadlines and expected delivery schedules. In serial production, expected monthly volumes, changes in customer orders and planned safety stocks are particularly important. Some input materials or semi-finished products may be lost during production. If the target is 10.000 conforming units and the expected overall process yield is 95%, approximately 10.527 input units must be planned. This calculation is important when estimating material quantities, working hours and production capacity requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">In multi-stage production, losses at individual processing operations must be analysed separately. For example, a loss at the final production stage has a different financial impact from a loss at the start, because additional material, labour and energy have already been invested in the defective product. Reliable scrap data therefore plays an important role in production and cost planning. Expected process losses must be distinguished from additional losses caused by process deviations. If particular losses are already included in standard consumption or time allowances, they must not be added again elsewhere, as this would overstate resource requirements.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Available capacity and bottlenecks<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Available production capacity is determined from the working calendar, number of shifts, shift duration and equipment capabilities. The basic calculation of available hours is:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>Available hours = Working days \u00d7 Number of shifts \u00d7 Planned working hours per shift<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">However, this calculated time is not yet the actual effective capacity. Planned overhauls, tool changes, process interruptions, expected downtime and other time losses must be considered. The same losses must not be counted repeatedly through different adjustment factors. Theoretical equipment capacity must be distinguished from realistically achievable capacity under existing production conditions. Processes with many different products must also account for different processing, setup and tool-change times. If the product mix changes during the year, the actual equipment workload changes too.<\/p>\n\n\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Products A and B: capacity utilisation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Continuing the previous example of products A and B, assume both pass through the same final production operation but require different processing times. Product A requires 0,3 machine hours and product B requires 1,2 machine hours of finishing.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Indicator<\/th><th>Product A<\/th><th>Product B<\/th><\/tr><\/thead><tbody><tr><td>Finishing time per unit<\/td><td>0,3 h<\/td><td>1,2 h<\/td><\/tr><tr><td>Initial production plan<\/td><td>1.000 units<\/td><td>1.000 units<\/td><\/tr><tr><td>Machine hours required \u2013 initial plan<\/td><td>300 h<\/td><td>1.200 h<\/td><\/tr><tr><td>Updated production plan<\/td><td>800 units<\/td><td>1.200 units<\/td><\/tr><tr><td>Machine hours required \u2013 updated plan<\/td><td>240 h<\/td><td>1.440 h<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">For simplicity, this example assumes sales quantities equal production quantities, with no inventory changes or additional scrap. The initial plan requires a total of 1.500 machine hours of finishing. After the product mix changes, 1.680 machine hours are required. Although total unit volume is unchanged, the load on this operation increases by 180 hours, or 12%. Assume the equipment has 230 planned working days, one eight-hour shift and a planned loss of 10% of available time. Total available time before planned losses is 1.840 hours. Deducting 10% gives effective available capacity of 1.656 hours.<\/p>\n\n\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Indicator<\/th><th>Original budget<\/th><th>Updated plan<\/th><\/tr><\/thead><tbody><tr><td>Machine hours required<\/td><td>1.500 h<\/td><td>1.680 h<\/td><\/tr><tr><td>Effective available hours<\/td><td>1.656 h<\/td><td>1.656 h<\/td><\/tr><tr><td>Capacity loading<\/td><td>90,6%<\/td><td>101,4%<\/td><\/tr><tr><td>Remaining capacity<\/td><td>156 h<\/td><td>\u221224 h<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">This example shows how a change in product mix can create a capacity shortfall even when total revenue and unit volume remain unchanged. Capacity loading is approximately 91% under the initial plan, while the updated plan exceeds available capacity by 24 hours. Without additional measures, some planned production cannot be completed on time. Possible solutions include changes to work schedules, additional working hours, improved equipment availability or reallocating production. The calculation assumes the full 10% planned loss is already included in effective capacity. The same loss must not be deducted again by additionally applying OEE or another efficiency factor.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">A company's total production capacity is often constrained by one or a few critical processes. Planning cannot therefore rely solely on the total number of available machines or employees. The load at individual processing operations must be calculated for the expected product mix. For example, a production line may have enough total available hours, while a specialised operation limits delivery of the entire plan. In such situations, options for reallocating production, changing operation sequences, reducing setup times or investing in additional capacity must be analysed. It is particularly useful to assess how demand changes for individual products could affect existing bottlenecks.<\/p>\n\n\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"materijali-zaposlenici\" style=\"margin-top:32px;margin-bottom:12px\">Materials, staffing and labour costs<\/h2>\n\n\n\n\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Bills of materials, material requirements and procurement<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Planning is based on bills of materials (BOMs), which define the materials and quantities required. Accurate BOMs are essential because they underpin material requirements calculations, purchasing and product costing. An incorrect consumption standard can cause the system to plan too little or too much material. Such errors can lead to shortages, unnecessary inventory or incorrect estimates of production costs. Before budgeting, BOMs should therefore be checked against current technical documentation and actual production processes. Companies with many products must ensure that planned products use the correct BOM and consumption-standard versions.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>Planned material quantity = Planned production \u00d7 Standard material quantity per unit<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Process losses must be included if they are not already built into the standard. For more complex products, the calculation spans multiple BOM levels, including all relevant components and semi-finished products. The material consumption plan must be linked to specific products or product groups. This connection makes it possible to calculate standard material consumption when production volumes or mix change during the year. Comparing this adjusted expected consumption with actual consumption then provides a better basis for assessing material efficiency.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Returning to products A and B, product A requires EUR 60 of material per unit, while product B requires EUR 20. At the initial plan of 1.000 units of each product, total standard material consumption is:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>(1.000 \u00d7 60 \u20ac) + (1.000 \u00d7 20 \u20ac) = 80.000 \u20ac<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">After the product mix changes to 800 units of A and 1.200 units of B, expected consumption is:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>(800 \u00d7 60 \u20ac) + (1.200 \u00d7 20 \u20ac) = 72.000 \u20ac<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The EUR 8.000 difference results from the change in product mix. If the company achieves exactly that revised mix and consumes material in line with standards, lower total material consumption would not represent an improvement in material efficiency. It would be the expected consequence of the changed production programme. The material budget must therefore be capable of being recalculated for actual quantities and product mix.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Once quantities have been calculated, expected purchase prices must be defined. These may come from existing contracts, new quotations, market trends or anticipated supplier negotiations. International procurement must also consider exchange-rate changes, transport and applicable import and other purchasing costs. Purchase price changes must be distinguished from changes in material quantities consumed because these effects are analysed separately later. A rise in total material cost does not automatically mean production consumed more than the standard allowance. It may result from higher purchase prices, a different product mix or greater production volume.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The material budget must therefore allow quantities and prices to be tracked separately. Planned material consumption is not the same as planned purchases. Existing inventory can meet part of the production requirement. Conversely, the company may plan to increase closing inventory to secure future production. The consumption plan must therefore be linked to inventory policy. This enables better procurement management and control of funds tied up in materials. It is particularly important to distinguish planned purchase quantities from the quantities expected to be consumed in production.<\/p>\n\n\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Labour hours, staffing and labour costs<\/h3>\n\n\n\n\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">A standard time must be defined for each processing operation. Total planned working hours are calculated by multiplying planned production quantities by the relevant time standards.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>Standard hours required = Planned quantity \u00d7 Standard hours per unit<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">This calculation estimates the total workload of individual production departments. Standard production hours, however, are not the same as total paid employee hours. Annual leave, sickness absence, training, expected efficiency and other activities that reduce effective available working time must be considered. Standard times must reflect actual production processes. Outdated standards or standards that do not match actual working methods can lead to substantial errors in required headcount estimates.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">In the A and B example, standard direct labour time is one hour for A and three hours for B. The initial plan of 1.000 units of each product requires:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>(1.000 \u00d7 1 h) + (1.000 \u00d7 3 h) = 4.000 working hours<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">After the mix changes to 800 units of A and 1.200 units of B, the requirement is:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>(800 \u00d7 1 h) + (1.200 \u00d7 3 h) = 4.400 working hours<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The total requirement increases by 400 standard hours, or 10%. Assume one employee has 1.600 effective working hours per year available for the planned production operations. The initial plan would require 2,50 FTE, while the updated plan would require 2,75 FTE.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Indicator<\/th><th>Original budget<\/th><th>Updated plan<\/th><\/tr><\/thead><tbody><tr><td>Standard hours required<\/td><td>4.000 h<\/td><td>4.400 h<\/td><\/tr><tr><td>Effective hours per FTE<\/td><td>1.600 h<\/td><td>1.600 h<\/td><\/tr><tr><td>Labour capacity required<\/td><td>2,50 FTE<\/td><td>2,75 FTE<\/td><\/tr><tr><td>Change<\/td><td>\u2014<\/td><td>+0,25 FTE<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">This calculation expresses an equivalent workload, not a recommendation to employ a fraction of a person. Actual work organisation must consider shift patterns, the availability of existing employees, skills and opportunities to reallocate activities. If the additional 400 hours cannot be covered by existing resources, overtime, employee reassignment, recruitment or another organisational solution must be considered. Required headcount expressed as FTE can be estimated from the workload and effective available hours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>FTE required = Working hours required \/ Effective available hours per employee<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The result must be checked against shift organisation, required skills and minimum staffing for individual production activities. Planning should extend beyond direct production operators. Production growth may also require additional employees in logistics, quality, planning, engineering or maintenance. Headcount cannot always be adjusted quickly when demand changes. A change in product mix can increase or decrease working-hour requirements without changing actual employee costs to the same extent. Required standard hours, available hours, actual hours worked and total employee costs must therefore be distinguished.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Labour costs, skills and flexibility<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Once required headcount is established, total labour costs are planned. These include agreed wages, applicable employer contributions and other employer costs, shift allowances, overtime, compensation and other employee entitlements. Large companies must also plan recruitment timing separately. For example, if additional employees are only needed in the second half of the year, the planned cost must reflect their actual expected employment period. Planned changes in wages, shift patterns and overtime require particular attention. If productivity improvements are expected, their impact on required working hours and actual employee costs must be assessed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Such improvements must be linked to specific activities and realistic implementation dates. Headcount alone does not guarantee the necessary production capacity; the skills mix matters too. A company may have enough employees overall but too few trained operators for particular machines or processes. A skills matrix helps identify these constraints and plan additional training. Multi-skilling can improve organisational flexibility and the use of available resources. This is particularly important where order mix and the load on individual production processes change frequently during the year.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"operativni-troskovi\" style=\"margin-top:32px;margin-bottom:12px\">Other operating costs and responsibilities<\/h2>\n\n\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Energy and utilities<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Electricity, gas, water and other energy costs can have a significant impact on manufacturing profitability, particularly in processes requiring large amounts of heat or electricity. Energy cost planning should therefore be linked to production volumes, equipment operating patterns and expected energy prices. As with materials and working hours, energy consumption is not necessarily proportional to total revenue or units produced. Different products may require different processes, temperatures, processing times and equipment operating modes. A change in product mix can therefore alter energy consumption without a significant change in total production value.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Analysis of previous energy consumption provides the starting point. Larger manufacturing companies benefit from reviewing consumption by plant, process or major equipment user. Consumption directly dependent on production load must be distinguished from the base consumption required to operate the infrastructure. For example, equipment may consume energy even when it is not producing, to maintain operating temperatures or other process conditions. This consumption must be included in the plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Future energy consumption can be estimated from expected production volumes and operating patterns. Stable processes can use consumption standards per unit produced or equipment operating hour. More complex processes require further analysis of product mix changes, warm-up times, planned downtime and work schedules. Planning must also include expected energy price changes and relevant tariff components. If product mix changes during the year, expected consumption should be reassessed for the actual equipment load. This separates consumption changes caused by different production activities from genuine improvements or deterioration in energy efficiency.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The energy budget should be more than an estimate of future bills. It can also support energy-efficiency improvement planning. Where investment in more efficient equipment or process optimisation is planned, expected savings and their realistic timing must be estimated. Such savings must be linked to specific activities rather than a general expectation of lower consumption.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Maintenance and equipment reliability<\/h3>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Equipment maintenance directly affects capacity availability, product quality and delivery reliability. The maintenance budget cannot therefore be seen solely as a cost to reduce. Underinvestment may temporarily lower operating expenses while increasing the risk of unplanned breakdowns, downtime and lost production. Expected equipment loading during the budget period must be considered. Higher production or more intensive use of existing machines may increase maintenance requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Planned preventive activities should form the basis of the budget. These are defined using equipment manufacturers' requirements, previous experience, machine condition and criticality to production. Major activities require plans for materials, spare parts, labour hours and any external servicing. Planned overhaul dates must be aligned with the production calendar. Scheduling an overhaul in a lower-load month can substantially reduce its impact on overall capacity availability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Even effective preventive maintenance cannot eliminate every breakdown. The budget must therefore include a realistic estimate of corrective maintenance, based on historical data, failure analysis, equipment age and technical risk assessments. For critical equipment, FMEA or similar risk assessment methods can identify potential failures with the greatest business consequences. Higher maintenance spending does not automatically indicate poorer management. In some situations, increased preventive activity can reduce breakdowns, unplanned downtime and total production costs over the longer term.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Some equipment-related activities are routine maintenance, while others may meet capitalisation criteria. Collaboration with finance is therefore needed to distinguish operating costs from capital investment correctly. The ultimate goal is to secure the required equipment reliability at an economically justified cost.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Quality and the cost of poor quality<\/h3>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Product quality directly affects a manufacturing company's results. Defective products consume additional materials, labour hours, energy and production capacity. Beyond direct production losses, quality problems can cause customer complaints, additional logistics costs, delivery delays and lost future business. Quality must therefore also be seen as an important element of financial management. Changes in product mix can affect total quality costs: products may differ in process complexity, number of inspections and expected production losses.<\/p>\n\n\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The Cost of Quality (COQ) framework provides a systematic view of the costs of assuring quality and failing to achieve it. These are generally classified as prevention, appraisal, internal failure and external failure costs. Prevention covers activities intended to prevent nonconformities, such as training, process development and preventive analysis. Appraisal covers inspections, tests, audits and other activities confirming product and process conformity. Internal failure costs arise from nonconformities found before delivery, while external failure costs arise after the product has reached the customer.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Cost of Poor Quality (COPQ) comprises internal and external failure costs. In large manufacturing organisations, these costs are often not visible as a single financial category. Scrap may appear within material costs, rework within employee costs, and customer claims within logistics or other operating costs. A method must therefore be established to analyse COPQ separately without counting it twice in the total budget.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The annual budget must define expected scrap and rework rates by production process or product group. This enables more realistic estimates of material requirements, labour hours and production costs. The stage at which losses occur is particularly important. A defective product discovered after all operations are complete often represents a larger financial loss than a nonconformity found early. Subsequent budget monitoring must separate variances caused by production volume and mix changes from those caused by a genuine rise in nonconformity rates. This gives a more realistic assessment of quality and production performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">If the company plans to reduce scrap or customer complaints, expected financial benefits must be linked to specific projects and activities. These may include process changes, additional process controls, employee training or new equipment. The realistic financial effect of improvements must be assessed, including which costs can actually be avoided. Quality management then becomes an integral part of budgeting and profitability improvement.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Logistics and inventory<\/h3>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Logistics physically connects procurement, production, warehouses and customers. Its costs depend on material and product quantities, shipment numbers, transport distances, storage conditions and packaging requirements. Large manufacturers must distinguish inbound from outbound logistics. Changes in sales volumes and product mix can significantly affect logistics costs. For example, particular products may need special packaging, additional transport protection or different handling methods. A realistic logistics budget cannot therefore always be calculated as a percentage of expected revenue.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Inbound logistics costs are planned from expected purchase quantities, supplier locations and agreed transport terms. Outbound costs follow from the sales plan, expected shipment numbers, markets and customer delivery terms. International operations must account for different transport modes, contractual terms and potential price changes. Planning should use expected quantities and logistics activities as well as the previous year's total transport costs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Raw materials, work in progress and finished goods are an important part of a manufacturing company's assets. Inventory levels affect continuity of production supply, delivery reliability and funding needs. Excessive inventory ties up more cash, while insufficient stock can interrupt production and delay deliveries. Target levels must therefore consider lead times, expected demand and operating risks. For products with volatile demand or long lead times, supply security must be balanced against the risk of slow-moving or obsolete inventory.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Inventory changes affect more than storage costs. They also affect the balance sheet, working capital and cash flow. Higher inventory can require additional funding even when production is efficient. The logistics budget must therefore align with production, procurement and financial planning. Inventory changes during the year should be traceable to changes in demand, production plans and purchasing activity.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Overheads and administrative costs<\/h3>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">In addition to direct production costs, a large company incurs significant support and administrative costs. These may include IT, finance, HR, legal services, insurance, facilities management, administration and other activities needed to operate the business. Although some are not directly attributable to a product, they are a real financial burden. Sound planning requires an understanding of cost behaviour. Fixed costs do not change significantly with production volume within a given activity range. Variable costs change with activity, while some categories combine both characteristics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">This distinction is important when assessing how business growth or contraction affects overall profitability. Lower sales or production volumes do not automatically produce a proportional reduction in total costs. Some costs remain unchanged because of contractual commitments, organisational structure or the minimum resources needed to run the company. Changes in business volume can therefore significantly affect profitability even when operating efficiency remains good.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">For overheads, reviewing the justification for individual activities is particularly useful. Instead of automatically increasing last year's figures, the company should establish which services and resources are actually needed. Planned external service costs should reflect the expected scope of contracted activities, while IT costs may depend on user numbers, licences or planned projects. This approach makes costs more transparent and easier to manage.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Cost centres and cost allocation<\/h3>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Large manufacturing organisations often have several plants, departments and support functions. An appropriate cost-centre structure is needed for effective cost planning and monitoring. A cost centre is an area for which costs are separately planned, recorded and analysed. It may be a production line, plant, or maintenance, logistics, quality or administrative department. Each centre should have a person responsible who participates in budgeting and subsequent monitoring. However, responsibility for recording a cost must be distinguished from the ability to control it. For example, a production manager may be responsible for efficient material use but have no influence over the agreed purchase price.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Responsibilities must therefore reflect actual decision-making authority. When analysing results, variances caused by changes in production load must be distinguished from inefficient resource use. Cost accountability is then connected to actual business decisions rather than accounting records alone.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Some costs can be attributed directly to products or activities, while others must be allocated using appropriate bases. Common manufacturing allocation bases include labour hours, machine hours, occupied floor space, energy consumption or other resource-use indicators. The basis must have an understandable connection to how the cost arises. Arbitrary allocation can misrepresent individual product profitability and influence business decisions. It is also important to distinguish an actual change in total cost from a change in its allocation between products. A different product mix may assign different shares of indirect costs to individual products even when total company costs have barely changed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Such a change does not necessarily represent a real increase or decrease in operating efficiency. More complex manufacturing systems can use Activity-Based Costing, which links costs to the activities that cause them. Products requiring frequent tool changes, special inspections or complex production preparation may generate higher indirect costs than products made in long runs. ABC can provide a more realistic view of the cost structure, particularly when product complexity varies significantly.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"kalkulacija-proizvoda\" style=\"margin-top:32px;margin-bottom:12px\">Standard costs and product profitability<\/h2>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Standard costs are predetermined expected values of the resources required to manufacture a product. Their purpose is to support production cost planning, comparison and control. A standard cost generally includes direct material, direct labour and applicable production overheads. In large manufacturing companies, standard costs are particularly important because they connect sales plans, production standards and financial results.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Current BOMs, process routings and standard production times provide the starting point. Direct material is calculated from required quantities and planned purchase prices. Direct labour cost is calculated from standard working hours and the applicable rate. Production overheads are allocated using the selected method and relevant allocation bases. Adding these elements gives the planned standard manufacturing cost. The calculation must reflect actual processes and use up-to-date standards. Changes to production technology, BOMs or operation times must be assessed for their costing impact.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Products A and B: standard cost<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Continuing with products A and B, assume a direct labour rate of EUR 12 per standard hour. Variable production overheads are EUR 3 per standard labour hour. Fixed production overheads of EUR 20.000 are planned for the production segment considered. With an initial plan of 4.000 standard labour hours, assumed to represent normal capacity for this simplified calculation, the planned fixed overhead allocation rate is EUR 5 per standard hour. These assumptions produce the following standard cost calculation:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Cost element<\/th><th>Product A<\/th><th>Product B<\/th><\/tr><\/thead><tbody><tr><td>Direct material<\/td><td>60 \u20ac<\/td><td>20 \u20ac<\/td><\/tr><tr><td>Standard labour hours<\/td><td>1 h<\/td><td>3 h<\/td><\/tr><tr><td>Direct labour<\/td><td>12 \u20ac<\/td><td>36 \u20ac<\/td><\/tr><tr><td>Variable production overheads<\/td><td>3 \u20ac<\/td><td>9 \u20ac<\/td><\/tr><tr><td>Allocated fixed production overheads<\/td><td>5 \u20ac<\/td><td>15 \u20ac<\/td><\/tr><tr><td><strong>Total standard manufacturing cost<\/strong><\/td><td><strong>80 \u20ac<\/strong><\/td><td><strong>80 \u20ac<\/strong><\/td><\/tr><tr><td>Net selling price<\/td><td>100 \u20ac<\/td><td>100 \u20ac<\/td><\/tr><tr><td><strong>Difference between selling price and standard manufacturing cost<\/strong><\/td><td><strong>20 \u20ac<\/strong><\/td><td><strong>20 \u20ac<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Interestingly, both products have the same total standard manufacturing cost in this example, despite using completely different resource structures. Product A has substantially higher material costs, while B requires more labour and a larger share of costs linked to working hours. Total product cost cannot therefore be the sole basis for production resource planning. Although standard manufacturing costs are equal, a shift in mix between A and B can significantly alter production loading, staffing needs and cash payments for materials.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Contribution margin and product mix<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Profitability analysis must distinguish full manufacturing cost from variable costs. Contribution margin shows how much product revenue remains after relevant variable costs to cover fixed costs and generate a result. In this simplified comparison, assume direct labour can be valued at a variable rate of EUR 12 per hour, with other variable production overheads of EUR 3 per hour. This gives the following comparison:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Indicator per unit<\/th><th>Product A<\/th><th>Product B<\/th><\/tr><\/thead><tbody><tr><td>Net selling price<\/td><td>100 \u20ac<\/td><td>100 \u20ac<\/td><\/tr><tr><td>Direct material<\/td><td>60 \u20ac<\/td><td>20 \u20ac<\/td><\/tr><tr><td>Direct labour \u2013 modelled variable cost<\/td><td>12 \u20ac<\/td><td>36 \u20ac<\/td><\/tr><tr><td>Variable production overheads<\/td><td>3 \u20ac<\/td><td>9 \u20ac<\/td><\/tr><tr><td><strong>Total modelled variable costs<\/strong><\/td><td><strong>75 \u20ac<\/strong><\/td><td><strong>65 \u20ac<\/strong><\/td><\/tr><tr><td><strong>Contribution margin<\/strong><\/td><td><strong>25 \u20ac<\/strong><\/td><td><strong>35 \u20ac<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">This comparison shows that product B generates a higher contribution margin per unit under the stated assumptions, despite requiring more working hours. It does not automatically follow that producing as much B as possible is commercially preferable. B requires more labour and may place a much greater load on particular production resources. If a critical process is already close to full capacity, contribution margin per bottleneck hour must also be analysed. Product mix decisions should therefore not rely solely on total margin per product. The company must understand each product's contribution relative to the resources it consumes and the constraints of the production system.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">In actual companies, some labour costs may be relatively fixed in the short term. In that case, the modelled contribution margin must be adjusted to reflect genuinely avoidable costs rather than automatically treating all wages as variable. We can now connect the earlier material, labour and standard cost calculations. The original budget included 1.000 units each of products A and B. The updated plan expects 800 units of A and 1.200 of B. Assuming production equals sales, no inventory change, variable costs changing with standard hours, and fixed production overheads remaining at EUR 20.000, the result is as follows.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Indicator<\/th><th>Original budget<\/th><th>Updated plan<\/th><th>Change<\/th><\/tr><\/thead><tbody><tr><td>Revenue<\/td><td>200.000 \u20ac<\/td><td>200.000 \u20ac<\/td><td>0 \u20ac<\/td><\/tr><tr><td>Direct material<\/td><td>80.000 \u20ac<\/td><td>72.000 \u20ac<\/td><td>\u22128.000 \u20ac<\/td><\/tr><tr><td>Modelled direct labour cost<\/td><td>48.000 \u20ac<\/td><td>52.800 \u20ac<\/td><td>+4.800 \u20ac<\/td><\/tr><tr><td>Variable production overheads<\/td><td>12.000 \u20ac<\/td><td>13.200 \u20ac<\/td><td>+1.200 \u20ac<\/td><\/tr><tr><td>Fixed production overheads<\/td><td>20.000 \u20ac<\/td><td>20.000 \u20ac<\/td><td>0 \u20ac<\/td><\/tr><tr><td><strong>Total modelled manufacturing costs<\/strong><\/td><td><strong>160.000 \u20ac<\/strong><\/td><td><strong>158.000 \u20ac<\/strong><\/td><td><strong>\u22122.000 \u20ac<\/strong><\/td><\/tr><tr><td><strong>Difference between revenue and the manufacturing costs shown<\/strong><\/td><td><strong>40.000 \u20ac<\/strong><\/td><td><strong>42.000 \u20ac<\/strong><\/td><td><strong>+2.000 \u20ac<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">This result shows the modelled effect of a product mix change, not the company's complete P&amp;L. Selling, administrative, financing and other costs are excluded. Actual labour costs may also differ from the linear model, particularly if additional hours require overtime or recruitment. Under full standard manufacturing costing, fixed overhead allocation variances must also be analysed separately. Fixed costs of EUR 20.000 do not automatically increase simply because more standard labour hours are produced. Nevertheless, the example demonstrates an important point.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">In this case, the expected difference between revenue and manufacturing costs improves by EUR 2.000, but labour requirements and the load on the critical process also increase. A financially more favourable product mix may therefore not be operationally feasible without additional measures. Connecting finance and production in this way is one of the key benefits of sound budgeting. Well-defined standard costs support product profitability analysis, assessment of purchase price changes and planning for the financial effects of product mix. They later provide the basis for analysing differences between planned and actual resource consumption. Product mix changes must be capable of being valued using appropriate standard cost calculations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">If the mix of products sold or manufactured changes during the year, the financial result expected at the new quantities and existing standards can be calculated. This separates the sales mix effect from actual production efficiency. In organisations using ERP, master data quality and regular standard cost updates are particularly important. Incorrect standards or outdated rates can substantially distort the picture of product profitability.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"provjera-odobrenje\" style=\"margin-top:32px;margin-bottom:12px\">Monthly planning, validation and budget approval<\/h2>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The annual budget is the overall business plan, but operating management requires monthly phasing. This supports timely monitoring and variance analysis. A common mistake is to divide annual values equally across twelve months, which often fails to reflect actual business patterns. Sales may be seasonal, with different delivery dates and volume changes during the year. Production also has a different number of working days each month. Annual leave, public holidays, planned overhauls and production programme changes affect available capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The monthly production plan should therefore use the actual working calendar and expected load. Project-based manufacturing must consider planned delivery stages and project deadlines. Serial production must account for seasonal order changes, expected customer schedules and planned product mix changes. Material costs should follow planned production and the accounting timing of consumption. Labour costs depend on headcount, shift patterns and expected allowances. Maintenance costs may rise during planned overhauls, while certain administrative items occur at known times.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Each planned cost must be included in the month when its relevant accounting effect is expected. Distinguishing costs that vary with production volume from those that remain relatively stable is particularly useful for subsequent variance analysis. A well-phased budget enables comparison of actual results with realistic monthly expectations, alongside year-to-date results and the remaining plan to year-end. This forms the basis for Budget vs. Actual analysis and reforecasting. The original monthly plan should remain the reference baseline even if actual sales and production change significantly during the year.<\/p>\n\n\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Consolidation, accounting consistency and risks<\/h3>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Once departments have prepared their plans, these must be combined into a single business model. Controlling plays an important role in coordination, analysis and data validation. Consolidation, however, is more than adding departmental budgets together. The plans must be checked for consistency and practical achievability. All departments must use the same initial sales and production assumptions. If procurement uses one production plan and HR another, the final budget will not provide a reliable business estimate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">The sales plan must align with planned production quantities. The production plan must match available capacity, staffing and planned material procurement. Energy costs should reflect expected equipment loading, and maintenance costs must align with the production calendar. Significant differences between plans must be investigated and reconciled. Productivity assumptions and expected savings require particular scrutiny. If the budget assumes higher productivity, it must be clear which activities will deliver it and when their actual effects are expected.<\/p>\n\n\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Double counting and incorrect distinctions between costs, expenses and cash payments must be avoided. Buying material does not automatically create a period expense, because some may remain in inventory or work in progress. Likewise, new equipment is generally not recognised in full as an operating expense at the moment of investment. Operating plans must therefore be connected to accounting rules determining when and how transactions affect the financial statements. Manufacturing costs included in inventory must also be distinguished from costs recognised as period expenses. This matters particularly when planned production and sales quantities differ significantly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Before final approval, the budget's sensitivity to key assumptions must be assessed. If substantial revenue growth is planned, the consequences of falling short should be analysed. The effects of higher purchase prices, exchange-rate changes, lower productivity or delayed investments should also be assessed. Base, optimistic and pessimistic scenarios can be developed for this purpose. In manufacturing, alternative scenarios must cover product mix changes as well as different total revenue figures.<\/p>\n\n\n\n\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Pre-approval checklist<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Area<\/th><th>Key review question<\/th><\/tr><\/thead><tbody><tr><td>Sales<\/td><td>Does the plan use objective, documented assumptions?<\/td><\/tr><tr><td>Production<\/td><td>Are planned quantities feasible within production capacity?<\/td><\/tr><tr><td>Materials<\/td><td>Do requirements match current BOMs and standards?<\/td><\/tr><tr><td>Employees<\/td><td>Do planned working hours meet production requirements?<\/td><\/tr><tr><td>Energy<\/td><td>Is consumption linked to expected equipment operation?<\/td><\/tr><tr><td>Maintenance<\/td><td>Are planned activities aligned with equipment load and condition?<\/td><\/tr><tr><td>Quality<\/td><td>Are scrap, rework and customer claims realistically planned?<\/td><\/tr><tr><td>Logistics<\/td><td>Do costs and inventory reflect expected business activity?<\/td><\/tr><tr><td>Costs<\/td><td>Is there an understandable link between activities and planned costs?<\/td><\/tr><tr><td>Finance<\/td><td>Are costs, expenses, investments and inventory correctly distinguished?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"margin-top:24px;margin-bottom:12px\">Approval and accountability for delivery<\/h3>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">After final consolidation, the budget is presented to management. The presentation must explain expected results, key assumptions and major risks, with particular attention to changes from the previous period. Planned revenue growth must be explained by its sources; planned profitability improvements must be linked to the activities that will deliver them. Management must be able to understand the operating assumptions as well as the financial result. Key risks relating to the sales plan, capacity, product mix and expected costs must be presented clearly.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">During final discussions, management may request further analysis or changes to budget items. Such adjustments must be implemented through actual business activities. If employee costs must fall, for example, it should be defined whether this will come from higher productivity, different work organisation or reduced overtime. Simply reducing a spreadsheet figure without changing operating assumptions is not real optimisation. Similarly, higher planned revenue must be supported by specific sales opportunities and capacity checks. If the sales plan changes during alignment, its effect on materials, working hours and other operating costs must be reassessed.<\/p>\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Following final alignment, the budget is formally approved under internal company rules. It becomes the official reference version for performance monitoring. The original version must be preserved for comparison with actual results throughout the year. Subsequent changes in expectations should be managed through forecasts or reforecasts, keeping the original plan as the baseline. This makes the difference between original expectations and actual business developments understandable, particularly where customers significantly change their orders and production plans during the year.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Formal budget approval marks the start of accountability for delivery. Each department must understand its planned activities, resources and targets. Finance and controlling provide methods, reporting and analysis, while operating management takes responsibility for the processes it manages. Financial targets must be translated into appropriate operating indicators. A production manager must understand how quantities, productivity, scrap and working-hour use affect financial results. A procurement manager must understand purchase price and purchasing term effects, and a quality manager the financial consequences of scrap, rework and customer claims.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\">Accountability must, however, reflect actual management authority. Production should not be assessed solely on total material costs if much of the variance comes from purchase price or product mix changes. Throughout the year, changes caused by business circumstances must be separated from actual process efficiency. The budget then becomes part of daily production management rather than merely a finance department document.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" style=\"margin-top:32px;margin-bottom:12px\">Conclusion: from the sales plan to the approved budget<\/h2>\n\n\n\n\n\n\n\n\n\n\n\n<p class=\"wp-block-paragraph\" style=\"margin-top:0px;margin-bottom:12px;line-height:1.6\"><strong>The budget is more than the outcome of planning. It is a shared agreement on business objectives, available resources and accountability for delivery.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Next article: <a href=\"https:\/\/leanandsmartpro.com\/en\/02-budzetiranje-investicije-i-financijski-rezultat\/\">Investments and financial performance<\/a>. Continue the series: <a href=\"https:\/\/leanandsmartpro.com\/en\/03-budzetiranje-pracenje-i-korekcije\/\">Budget monitoring and corrective action<\/a>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Need to connect your production plan, costs and budget? <a href=\"mailto:info@leanandsmartpro.com\">Request an initial assessment<\/a>.<\/p>\n\n\n\n\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>01 \u2013 BUD\u017dETIRANJE: IZRADA PLANA Kako izraditi godi\u0161nji operativni bud\u017eet velike proizvodne kompanije Prakti\u010dni vodi\u010d kroz planiranje prodaje, proizvodnih kapaciteta, zaposlenika, materijala, operativnih tro\u0161kova i poslovnih resursa. Godi\u0161nji operativni bud\u017eet povezuje o\u010dekivanu prodaju s proizvodnim mogu\u0107nostima, potrebnim resursima i tro\u0161kovima. Izra\u0111uju ga zajedno prodaja, proizvodnja, nabava, logistika, odr\u017eavanje, kvaliteta, ljudski resursi i financije. Polazi\u0161te su [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-8656","page","type-page","status-publish","hentry"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"A practical guide to a manufacturing operating budget: sales, capacity, materials, staffing, standard costs and approval, with worked examples.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\n\t\t<meta name=\"google-site-verification\" content=\"1MbbwsK-5eegf4YUrF-N1qc9EL5LOWVQT7JutxPJvIo\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_GB\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Lean and smart - Lean management | Process improvement | Consulting\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Manufacturing Budget: Preparing the Annual Plan | Lean &amp; Smart\" \/>\n\t\t<meta property=\"og:description\" content=\"A practical guide to a manufacturing operating budget: sales, capacity, materials, staffing, standard costs and approval, with worked examples.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-11-10T13:17:16+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-11-17T08:01:58+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Manufacturing Budget: Preparing the Annual Plan | Lean &amp; Smart\" \/>\n\t\t<meta name=\"twitter:description\" content=\"A practical guide to a manufacturing operating budget: sales, capacity, materials, staffing, standard costs and approval, with worked examples.\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/01-budzetiranje-izrada-plana\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/01-budzetiranje-izrada-plana\\\/#listItem\",\"name\":\"01 Bud\\u017eetiranje \\u2013 Izrada plana\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/01-budzetiranje-izrada-plana\\\/#listItem\",\"position\":2,\"name\":\"01 Bud\\u017eetiranje \\u2013 Izrada plana\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/#listItem\",\"name\":\"Home\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/#organization\",\"name\":\"Lean and smart\",\"description\":\"Lean management | Process improvement | Consulting\",\"url\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/01-budzetiranje-izrada-plana\\\/#webpage\",\"url\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/01-budzetiranje-izrada-plana\\\/\",\"name\":\"Manufacturing Budget: Preparing the Annual Plan | Lean & Smart\",\"description\":\"A practical guide to a manufacturing operating budget: sales, capacity, materials, staffing, standard costs and approval, with worked examples.\",\"inLanguage\":\"en-GB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/01-budzetiranje-izrada-plana\\\/#breadcrumblist\"},\"datePublished\":\"2026-11-10T14:17:16+01:00\",\"dateModified\":\"2026-11-17T09:01:58+01:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/\",\"name\":\"Lean and smart\",\"description\":\"Lean management | Process improvement | Consulting\",\"inLanguage\":\"en-GB\",\"publisher\":{\"@id\":\"https:\\\/\\\/leanandsmartpro.com\\\/en\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Manufacturing Budget: Preparing the Annual Plan | Lean & Smart","description":"A practical guide to a manufacturing operating budget: sales, capacity, materials, staffing, standard costs and approval, with worked examples.","canonical_url":"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":"&lt;meta name=\"google-site-verification\" content=\"1MbbwsK-5eegf4YUrF-N1qc9EL5LOWVQT7JutxPJvIo\" \/&gt;"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BreadcrumbList","@id":"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/leanandsmartpro.com\/en\/#listItem","position":1,"name":"Home","item":"https:\/\/leanandsmartpro.com\/en\/","nextItem":{"@type":"ListItem","@id":"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#listItem","name":"01 Bud\u017eetiranje \u2013 Izrada plana"}},{"@type":"ListItem","@id":"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#listItem","position":2,"name":"01 Bud\u017eetiranje \u2013 Izrada plana","previousItem":{"@type":"ListItem","@id":"https:\/\/leanandsmartpro.com\/en\/#listItem","name":"Home"}}]},{"@type":"Organization","@id":"https:\/\/leanandsmartpro.com\/en\/#organization","name":"Lean and smart","description":"Lean management | Process improvement | Consulting","url":"https:\/\/leanandsmartpro.com\/en\/"},{"@type":"WebPage","@id":"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#webpage","url":"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/","name":"Manufacturing Budget: Preparing the Annual Plan | Lean & Smart","description":"A practical guide to a manufacturing operating budget: sales, capacity, materials, staffing, standard costs and approval, with worked examples.","inLanguage":"en-GB","isPartOf":{"@id":"https:\/\/leanandsmartpro.com\/en\/#website"},"breadcrumb":{"@id":"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/#breadcrumblist"},"datePublished":"2026-11-10T14:17:16+01:00","dateModified":"2026-11-17T09:01:58+01:00"},{"@type":"WebSite","@id":"https:\/\/leanandsmartpro.com\/en\/#website","url":"https:\/\/leanandsmartpro.com\/en\/","name":"Lean and smart","description":"Lean management | Process improvement | Consulting","inLanguage":"en-GB","publisher":{"@id":"https:\/\/leanandsmartpro.com\/en\/#organization"}}]},"og:locale":"en_GB","og:site_name":"Lean and smart - Lean management | Process improvement | Consulting","og:type":"article","og:title":"Manufacturing Budget: Preparing the Annual Plan | Lean &amp; Smart","og:description":"A practical guide to a manufacturing operating budget: sales, capacity, materials, staffing, standard costs and approval, with worked examples.","og:url":"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/","article:published_time":"2026-11-10T13:17:16+00:00","article:modified_time":"2026-11-17T08:01:58+00:00","twitter:card":"summary_large_image","twitter:title":"Manufacturing Budget: Preparing the Annual Plan | Lean &amp; Smart","twitter:description":"A practical guide to a manufacturing operating budget: sales, capacity, materials, staffing, standard costs and approval, with worked examples."},"aioseo_meta_data":{"post_id":"8656","title":null,"description":null,"keywords":null,"keyphrases":null,"focus_keyword":null,"additional_keywords":null,"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-11-13 15:54:08","updated":"2026-11-17 08:50:44"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/leanandsmartpro.com\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t01 Bud\u017eetiranje \u2013 Izrada plana\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/leanandsmartpro.com\/en\/"},{"label":"01 Bud\u017eetiranje \u2013 Izrada plana","link":"https:\/\/leanandsmartpro.com\/en\/01-budzetiranje-izrada-plana\/"}],"_hostinger_reach_plugin_has_subscription_block":false,"_hostinger_reach_plugin_is_elementor":false,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/leanandsmartpro.com\/en\/wp-json\/wp\/v2\/pages\/8656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/leanandsmartpro.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/leanandsmartpro.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/leanandsmartpro.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/leanandsmartpro.com\/en\/wp-json\/wp\/v2\/comments?post=8656"}],"version-history":[{"count":12,"href":"https:\/\/leanandsmartpro.com\/en\/wp-json\/wp\/v2\/pages\/8656\/revisions"}],"predecessor-version":[{"id":8762,"href":"https:\/\/leanandsmartpro.com\/en\/wp-json\/wp\/v2\/pages\/8656\/revisions\/8762"}],"wp:attachment":[{"href":"https:\/\/leanandsmartpro.com\/en\/wp-json\/wp\/v2\/media?parent=8656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}